• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 29. Cab Bolts at Door.
Figure 32. Headrest Installation.

Field Maintenance Manual 3 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  1027    1028    1029    1030    1031  1032  1033    1034    1035    1036    1037  
img
.
TM 5-2410-241-23-3
0297
CAB INSTALLATION CONTINUED
12. Install rifle rack (Figure 30, Item 1), four washers (Figure 30, Item 2), and screws (Figure 30, Item 3).
Figure 30. Rifle Rack.
0297
13. Remove tiedown strap securing messenger harness (Figure 31, Item 5) to messenger assembly (Figure 31,
Item 1). Connect wiring harness connector (Figure 31, Item 4) to machine wiring harness.
14. Install two washers (Figure 31, Item 3), bolts (Figure 31, Item 2), and wiring harness (Figure 31, Item 5) to
machine.
Figure 31. Messenger Assembly.
0297
0297-28


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.