Home
Download PDF
Order CD-ROM
Order in Print
Figure 25. Wiring Harness Connector and Angle Bracket.
Figure 29. Cab Bolts at Door.
Field Maintenance Manual 3 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
1025
1026
1027
1028
1029
1030
1031
1032
1033
1034
1035
TM
5-2410-241-23-3
0297
CAB
INSTALLATION
CONTINUED
6.
Position
instrument
panel
(Figure
27,
Item
3)
and
install
two
bolts
(Figure
27,
Item
2)
and
four
screws
(Figure
27,
Item
1).
Figure
27.
Instrument
Panel.
0297
0297-26