• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Table 1. Maintenance Allocation Chart (MAC) for D7R Series II Dozer, Type I with Winch ?and D7R Series II Dozer, Type II with Ripper - Continued
Table 1. Maintenance Allocation Chart (MAC) for D7R Series II Dozer, Type I with Winch ?and D7R Series II Dozer, Type II with Ripper - Continued

Field Maintenance Manual 3 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  1072    1073    1074    1075    1076  1077  1078    1079    1080    1081    1082  
img
TM 5-2410-241-23-3
0302
Table 1. Maintenance Allocation Chart (MAC) for D7R Series II Dozer, Type I with Winch 
and D7R Series II Dozer, Type II with Ripper - Continued.
(1)
(2)
(3)
(4)
(5)
(6)
Maintenance Level
Field
Sustainment
Component/
Maintenance
Tools and
LCN
Assembly
Function
C
F
H
D
Equipment
Remarks
CAB
INSTALLATION
AD
- CONTINUED
Pilot Valve 
AD26
Replace
7.5
65
(with Winch)
Pilot Valve 
BD01
Replace
7.0
65
(with Ripper)
AD27
Governor and
Replace
1.5
65,68
Brake Pedal
AD28
Switch and
Replace
1.5
65
Harness
Assembly
(Service Brake)
Replace
2.0
65,68
AD29
Cab Wiring
Harness
AD30
Flood Lamp
Replace
1.0
65
Harness
ADA
Seat Assembly
Replace
5.0
65,68
Repair
5.0
65,68
ADA01
Seat Suspension Replace
0.5
65
Door Assembly
Replace
2.5
65,68
ADB
Repair
2.0
65,68
ADB01
Door Wiper
Replace
1.5
65,68
Motor
Instrument Panel Replace
ADC
1.0
65,68
Repair
2.5
65,68
ADD
Cab/Cylinder
Replace
1.0
65
Flood Lamp and
Repair
1.0
65
Bracket
BULLDOZER
BLADE
AE
INSTALLATION
AE01
Yoke
Replace
1.5
11,13,65
Trunnion (Blade) Replace
2.5
65
AE02
0302-12


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.