• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Table 1. Maintenance Allocation Chart (MAC) for D7R Series II Dozer, Type I with Winch ?and D7R Series II Dozer, Type II with Ripper - Continued
Table 1. Maintenance Allocation Chart (MAC) for D7R Series II Dozer, Type I with Winch ?and D7R Series II Dozer, Type II with Ripper - Continued

Field Maintenance Manual 3 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  1068    1069    1070    1071    1072  1073  1074    1075    1076    1077    1078  
img
TM 5-2410-241-23-3
0302
Table 1. Maintenance Allocation Chart (MAC) for D7R Series II Dozer, Type I with Winch 
and D7R Series II Dozer, Type II with Ripper - Continued.
(1)
(2)
(3)
(4)
(5)
(6)
Maintenance Level
Field
Sustainment
Component/
Maintenance
Tools and
LCN
Assembly
Function
C
F
H
D
Equipment
Remarks
CHASSIS
INSTALLATION-
AC, BC
CONTINUED
AC18
Power Converter Test
0.5
Replace
2.5
65
AC19
Wiring Harness
Replace
1.0
65
Assembly
(Steering
Control)
Right Cab Switch Replace
5.5
65
AC20
Panel Harness
Assembly
AC21
Solenoid
Replace
0.5
65
Harness
Assembly
(Winch Rear)
AC22
Horn
Replace
1.0
65
AC23
Back Up Alarm
Test
0.5
Replace
0.5
65
AC24
Hydraulic Oil
Replace
1.5
65,68
Filter
19,65,68
AC25
Hydraulic Tank
Replace
4.5
AC26
Hydraulic Tank
Replace
1.0
65,68
Enclosure
AC27
Pump Lines
Replace
5.6
65,68
AC28
Lift Cylinder
Replace
10.0
65,68
Lines
AC29
Tilt Cylinder
Replace
8.5
65,68
Lines
Replace
14.6
65,68
AC30
Hydraulic
Suction Line
AC31
Hydraulic Oil
Replace
13.1
19,65,68
Cooler Lines
AC32
Bottom Guards
Replace
1.5
42,49,50,
56,65,68
AC33
Radiator Guard
Replace
6.0
11,65,68
A

0302-8


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.