• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Table 1. Maintenance Allocation Chart (MAC) for D7R Series II Dozer, Type I with Winch ?and D7R Series II Dozer, Type II with Ripper - Continued
Table 1. Maintenance Allocation Chart (MAC) for D7R Series II Dozer, Type I with Winch ?and D7R Series II Dozer, Type II with Ripper - Continued

Field Maintenance Manual 3 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  1064    1065    1066    1067    1068  1069  1070    1071    1072    1073    1074  
img
TM 5-2410-241-23-3
0302
Table 1. Maintenance Allocation Chart (MAC) for D7R Series II Dozer, Type I with Winch 
and D7R Series II Dozer, Type II with Ripper - Continued.
(1)
(2)
(3)
(4)
(5)
(6)
Maintenance Level
Field
Sustainment
Component/
Maintenance
Tools and
LCN
Assembly
Function
C
F
H
D
Equipment
Remarks
AA
ENGINE
INSTALLATION
- CONTINUED
65,73
Replace
5.0
AAA35
Valve
Mechanism
Cover and Base
1.0
Adjust
AAAA
Rocker Arm
65,68,73
Replace
12.5
Assembly
Repair
3.0
Inspect
AAAB
Cylinder Head
0.1
Replace
11,65,68,
C
Assembly
31.0
72
Rebuild
8.0
AAB
Air Cleaner
Inspect
0.1
65,68
Replace
2.0
65,68
Repair
1.0
AAC
Implement Pump Inspect
0.1
Test
1.0
65
Replace
35.5
Repair
2.0
AB
POWERTRAIN
INSTALLATION
AB01
Adapter
Replace
8.1
65
AB02
Axle
Replace
1.0
1,9,65
AB03
Main Drive Shaft Replace
2.0
65,73
AB04
Powertrain Lines Replace
2.0
19,20,
65,68
AB05
Powertrain
Replace
2.5
65,68
Manifold
AB06
Coupling
Replace
4.5
65
AB07
Transmission
Replace
14.0
65
Mounting
0302-4


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.