• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
MAINTENANCE ALLOCATION CHART (MAC)
Table 1. Maintenance Allocation Chart (MAC) for D7R Series II Dozer, Type I with Winch ?and D7R Series II Dozer, Type II with Ripper - Continued

Field Maintenance Manual 3 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  1062    1063    1064    1065    1066  1067  1068    1069    1070    1071    1072  
img
TM 5-2410-241-23-3
0302
Table 1. Maintenance Allocation Chart (MAC) for D7R Series II Dozer, Type I with Winch 
and D7R Series II Dozer, Type II with Ripper - Continued.
(6)
(1)
(2)
(3)
(4)
(5)
Maintenance Level
Field
Sustainment
Component/
Maintenance
Tools and
LCN
Assembly
Function
C
F
H
D
Equipment
Remarks
AA
ENGINE
INSTALLATION
- CONTINUED
AAA
Engine
Replace
34.5
4,33,57,
Assembly
65,68
Repair
1.0
65,68
Rebuild
46.0
3.0
AAA01
Starter
Test
1.0
65
Replace
AAA02
Turbocharger
Test
3.0
Replace
1.5
65
AAA03
Exhaust Manifold Replace
6.5
65,73
AAA04
Aftercooler
Replace
7.5
65
AAA05
Fuel Injector
Test
1.0
Replace
17.5
65,73
Replace
4.0
65
AAA06
Fuel Injection
Manifold
Replace
2.5
65,68
AAA07
Primary Fuel
Filter, Base, and
Bracket
AAA08
Secondary Fuel
Test
0.5
65,68
Filter, Base, and
Replace
1.5
65,68
Hose
Replace
3.0
65, 68
AAA09
Fuel Transfer
Pump
AAA10
Temperature
Replace
4.0
65
C
Regulator
AAA11
Cooling Manifold Replace
5.0
65,68
C
AAA12
Water Pump
Replace
7.0
65
C
Replace
6.0
AAA13
Aftercooler
65
C
Water Pump
Front Crankshaft Replace
5.5
65
AAA14
Seal
Replace
3.5
65,73
AAA15
Crankshaft
Damper, Pulley,
and Adapter
0302-2


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.