• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Table 1. Maintenance Allocation Chart (MAC) for D7R Series II Dozer, Type I with Winch ?and D7R Series II Dozer, Type II with Ripper - Continued
Table 1. Maintenance Allocation Chart (MAC) for D7R Series II Dozer, Type I with Winch ?and D7R Series II Dozer, Type II with Ripper - Continued

Field Maintenance Manual 3 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  1066    1067    1068    1069    1070  1071  1072    1073    1074    1075    1076  
img
TM 5-2410-241-23-3
0302
Table 1. Maintenance Allocation Chart (MAC) for D7R Series II Dozer, Type I with Winch 
and D7R Series II Dozer, Type II with Ripper - Continued.
(1)
(2)
(3)
(4)
(5)
(6)
Maintenance Level
Field
Sustainment
Component/
Maintenance
Tools and
LCN
Assembly
Function
C
F
H
D
Equipment
Remarks
AB
POWERTRAIN
INSTALLATION
- CONTINUED
Replace
7.0
10,12,52,
ABD
Brake and
65,68,72
Planetary
Assembly
Rebuild
8.0
ABE
Brake and
Inspect
0.1
Differential Drive Rebuild
8.0
1, 9,11,12,
53,65,
Assembly
68,72
Repair
8.0
ABF
Hydrostatic Drive Replace
5.5
33,53,54,
Motor
65,68
Rebuild
16.0
ABF01
Gear Pump
Replace
8.0
33,36,54,
65
1,7,10,20,
ABH
Transmission
Replace
8.5
65,68
Assembly
Rebuild
20.0
ABH01
Transmission
Replace
8.0
12,65
Sensor Harness
Assembly
ABH02
Control Valve
Test
1.0
(Steering and
Replace
3.5
65,68,
Brake)
Rebuild
4.0
73,74
ABH03
Transmission
Replace
1.5
65,68
System Oil Filter
Base
ABJ
Torque
Test
1.0
Converter
Replace
10.5
10,33,36,
65,68,73
Rebuild
16.0
0.5
65
ABJ01
Transmission
Replace
Clutch Solenoid
0302-6


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.