TM 5-2410-241-23-3
0302
Table 1. Maintenance Allocation Chart (MAC) for D7R Series II Dozer, Type I with Winch
and D7R Series II Dozer, Type II with Ripper - Continued.
(1)
(2)
(3)
(4)
(5)
(6)
Maintenance Level
Field
Sustainment
Component/
Maintenance
Tools and
LCN
Assembly
Function
C
F
H
D
Equipment
Remarks
AB
POWERTRAIN
INSTALLATION
- CONTINUED
Replace
7.0
10,12,52,
ABD
Brake and
65,68,72
Planetary
Assembly
Rebuild
8.0
ABE
Brake and
Inspect
0.1
Differential Drive Rebuild
8.0
1, 9,11,12,
53,65,
Assembly
68,72
Repair
8.0
ABF
Hydrostatic Drive Replace
5.5
33,53,54,
Motor
65,68
Rebuild
16.0
ABF01
Gear Pump
Replace
8.0
33,36,54,
65
1,7,10,20,
ABH
Transmission
Replace
8.5
65,68
Assembly
Rebuild
20.0
ABH01
Transmission
Replace
8.0
12,65
Sensor Harness
Assembly
ABH02
Control Valve
Test
1.0
(Steering and
Replace
3.5
65,68,
Brake)
Rebuild
4.0
73,74
ABH03
Transmission
Replace
1.5
65,68
System Oil Filter
Base
ABJ
Test
1.0
Converter
Replace
10.5
10,33,36,
65,68,73
Rebuild
16.0
0.5
65
ABJ01
Transmission
Replace
0302-6