• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Table 1. Maintenance Allocation Chart (MAC) for D7R Series II Dozer, Type I with Winch ?and D7R Series II Dozer, Type II with Ripper - Continued
Table 1. Maintenance Allocation Chart (MAC) for D7R Series II Dozer, Type I with Winch ?and D7R Series II Dozer, Type II with Ripper - Continued

Field Maintenance Manual 3 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  1071    1072    1073    1074    1075  1076  1077    1078    1079    1080    1081  
img
TM 5-2410-241-23-3
0302
Table 1. Maintenance Allocation Chart (MAC) for D7R Series II Dozer, Type I with Winch 
and D7R Series II Dozer, Type II with Ripper - Continued.
(1)
(2)
(3)
(4)
(5)
(6)
Maintenance Level
Field
Sustainment
Component/
Maintenance
Tools and
LCN
Assembly
Function
C
F
H
D
Equipment
Remarks
CAB
INSTALLATION
AD
- CONTINUED
AD10
Headliner,
Replace
1.0
65,68
Interior Trim
Panels
AD11
Headliner,
Replace
0.5
65
Harness
AD12
Cab Overhead
Replace
0.5
65
Interior Lamp
AD13
Wiper Control
Replace
1.0
65
Plate and Switch
Front Floor Plate Replace
AD14
1.0
65
AD15
Rear Floor Plate
Replace
2.5
65
AD16
Washer Bottle
Replace
0.5
65
and Bracket
AD17
Washer Hoses
Replace
3.5
65,68
AD18
Rollover
Inspect
0.1
Protective
Replace
1.5
54,65,
Structure
68,72
(ROPS)
Adjust
Steering Control
1.0
65
AD19
Rod
Replace
5.5
Replace
6.0
65
AD20
Steering and
Transmission
Control
AD21
Cab
Replace
4.5
54,65,68
AD22
Window
Replace
2.0
65,68
AD23
Messenger
Replace
0.5
65
AD24
Outside Cab
Replace
0.5
65,68
Door Latch
Repair
0.7
65
AD25
Pilot Valve
Replace
5.5
65,67,68
Bulldozer
0302-11


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.