TM 5-2410-241-23-3
0302
Table 1. Maintenance Allocation Chart (MAC) for D7R Series II Dozer, Type I with Winch
and D7R Series II Dozer, Type II with Ripper - Continued.
(1)
(2)
(3)
(4)
(5)
(6)
Maintenance Level
Field
Sustainment
Component/
Maintenance
Tools and
LCN
Assembly
Function
C
F
H
D
Equipment
Remarks
AB
POWERTRAIN
INSTALLATION
- CONTINUED
0.1
Inspect
AB08
28,29
1.0
Adjust
Converter Relief
4.5
65
Replace
Valve
1.0
AB09
Accumulator
Test
4.0
16,20,
Replace
65,68
ABA
Track
Replace
2.5
42,49,50,
Repair
20.0
56,65,68,
72
Adjust
0.5
A
ABA01
Track Shoe
Replace
1.0
65,68, 72
ABA02
Track Link
Replace
8.0
65,68, 72
15.0
Replace
ABB
Track Roller
30.0
Frame Assembly Repair
Strip Plate
Replace
1.0
65
ABB01
ABB02
Double Flange
Replace
4.5
26,42,49,
Track Roller
50,56,65,
68,72
Single Flange
Replace
4.5
26, 42,49,
ABB03
Track Roller
50,56,65,
68,72
ABB04
Pivot Shaft Seal
Replace
2.0
65,68
ABB05
Idler Assembly
Replace
4.5
54,65,68,
72
ABBA
Track Adjuster
Replace
8.0
33,51,54,
and Recoil
65,68
Assembly
Repair
1.0
20.0
ABC
Final Drive
Replace
7.0
12,52,65,
Assembly
68,72
Repair
1.0
65,68
Rebuild
20.0
ABC01
Sprocket
Replace
0.8
65,68,72
Segment
0302-5