• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 12. Minimum Fan Speed Calibration.
AIR INLET AND EXHAUST SYSTEM TESTS, INSPECTIONS, AND ADJUSTMENTS

Field Maintenance Manual 1 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  1281    1282    1283    1284    1285  1286  1287    1288    1289    1290    1291  
img
.
TM 5-2410-240-23-1
0027
HYDRAULIC FAN SPEED CALIBRATION AND ADJUSTMENT CONTINUED
5. Once minimum fan speed is correct, select Next (Figure 13, Item 3) button to complete test.
6. Select Continue button (Figure 13, Item 2) when CALIBRATION SUCCESSFUL window (Figure 13, Item 1)
displays.
Figure 13. Minimum Fan Speed Calibration Success.
0027
7. Remove test equipment.
END OF TASK
END OF WORK PACKAGE
0027-18


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.