TM 5-2410-240-23-2
0056
INSTALLATION
00056
N OT E
Install wires as noted during removal.
1. Install new O-ring (Figure 1, Item 4) on coolant temperature sensor (Figure 1, Item 3).
2. Install coolant temperature sensor (Figure 1, Item 3) on engine. Tighten coolant temperature sensor.
3. Connect harness connector (Figure 1, Item 2) to coolant temperature sensor (Figure 1, Item 3). Slide lock tab
(Figure 1, Item 1) to lock position.
END OF TASK
FOLLOW-ON TASKS
00056
1. Install secondary fuel filter (WP 0063).
3. Verify correct operation of machine (TM 5-2410-240-10).
END OF TASK
END OF WORK PACKAGE
0056-3/(4 blank)