• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 1. Panel.
Figure 3. Panel.

Field Maintenance Manual 2 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  257    258    259    260    261  262  263    264    265    266    267  
img
.
TM 5-2410-240-23-2
0063
REMOVAL CONTINUED
2. Set fuel shutoff valve (Figure 2, Item 2) to closed position.
3. Position drain pan and remove filter (Figure 2, Item 3) from base (Figure 2, Item 1).
Figure 2. Filter.
0063
CLEANING AND INSPECTION
00063
Clean and inspect all parts IAW Mechanical General Maintenance Instructions (WP 0282).
END OF TASK
INSTALLATION
00063
1. Turn new filter (Figure 2, Item 3) clockwise to install on base (Figure 2, Item 1).
2. Tighten new filter (Figure 2, Item 3) until seal contacts base (Figure 2, Item 1), then tighten an additional
1/4 turn, and remove drain pan.
3. Open fuel shutoff valve (Figure 2, Item 2).
0063-3


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.