• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 7. Guide Studs, Dowels, and Dust Seal on Engine.
Figure 9. Flywheel Housing and Retaining Bolts.

Field Maintenance Manual 2 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  490    491    492    493    494  495  496    497    498    499    500  
img
.
TM 5-2410-240-23-2
0098
INSTALLATION CONTINUED
5. Install lifting device on flywheel housing (Figure 8, Item 1).
WARN I N G
Use extreme caution when handling heavy parts. Provide adequate support and use
assistance during procedure. Ensure any lifting device used is in good condition and of
suitable load capacity. Keep clear of heavy parts supported only by lifting device. Failure to
follow this warning may cause injury or death to personnel.
N OT E
Flywheel housing weighs approximately 71 lb (32 kg).
Make sure dowels seat properly on flywheel housing.
6. Using lifting device and with assistance, install flywheel housing (Figure 8, Item 1) on engine (Figure 8, Item 3).
N OT E
Install bolts as noted during removal.
7. Install four bolts (Figure 8, Items 2 and 5) retaining flywheel housing (Figure 8, Item 1) on engine (Figure 8,
Item 3).
8. Torque two bolts (Figure 8, Item 2) to 140 lb-ft (190 Nm).
9. Torque two bolts (Figure 8, Item 5) to 85 lb-ft (115 Nm).
10. Remove two guide studs (Figure 8, Item 4) from engine (Figure 8, Item 3).
Figure 8. Flywheel Housing, Guide Studs, and Retaining Bolts.
0098
0098-8


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.