• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
HORN WIRING HARNESS REPLACEMENT - Continued
Figure 2. Chassis Harness Retaining Hardware Above Engine ECM and Behind Left Rear of Engine

Field Maintenance Manual 2 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  982    983    984    985    986  987  988    989    990    991    992  
img
. .
8
TM 5-2410-240-23-2
0152
FIELD MAINTENANCE
-
ACCU-GRADE WIRING HARNESS REPLACEMENT
0152
Removal, Cleaning and Inspection, Installation
INITIAL SETUP
Equipment Conditions
Tools and Special Tools
0
0
Tool Kit, General Mechanic's
Machine parked (TM 5-2410-240-10)
0
(WP 0289, Item 51)
Left engine access panel removed (WP 0184)
0
0
Right engine access panel removed
Materials/Parts
0
(WP 0182)
0
Cap set, protective (WP 0290, Item 4)
0
Debris guards removed (WP 0187)
0
Rag, wiping (WP 0290, Item 21)
0
Hood removed (WP 0186)
0
Tag, marker (WP 0290, Item 30)
0
Hood support removed (WP 0188)
0
Tiedown strap (WP 0290, Item 31)
0
Drawings Required
0
References
0
TM 5-2410-240-24P, Figure 65
0
WP 0282
0
Estimated Time to Complete
0
1.0 Hr
0
N OT E
This wiring harness is for Accu-Grade option only.
REMOVAL
000152
1. Remove tiedown strap (Figure 1, Item 3) and disconnect two connectors (Figure 1, Item 2).
2. Remove two grommets (Figure 1, Item 1) from hood support (Figure 1, Item 5) and from chassis harness
(Figure 1, Item 4).
Figure 1. Chassis Harness Underneath Hood.
0152
0152-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.