22
TM 5-2410-240-23-3
FIELD MAINTENANCE
-
02
02
Removal, Disassembly, Cleaning and Inspection, Assembly, Installation
INITIAL SETUP
Personnel Required
Tools and Special Tools
0
0
Tool Kit, General Mechanic's
Two
0
0
References
0
0
0
0
Equipment Conditions
0
0
Lifting Device (1,000-lb minimum capacity)
Machine parked (TM 5-2410-240-10)
0
0
Air conditioning refrigerant recovered
Materials/Parts
0
0
0
0
Drawings Required
0
0
TM 5-2410-240-24P, Figure 89, 91, 110
0
0
0
Estimated Time to Complete
0
0
2.0 Hr
O-ring (4)
0
0
0202-1