• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 17. Left Side Bracket and Retaining Hardware.
Figure 19. A/C Condenser Hose Connections and Hose Retainer.

Field Maintenance Manual 3 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  301    302    303    304    305  306  307    308    309    310    311  
img
.
TM 5-2410-240-23-3
0202
INSTALLATION CONTINUED
N OT E
Install electrical connectors as tagged during removal.
8. Connect cab harness (Figure 18, Item 9) to relay harness (Figure 18, Item 10).
9. Install clamp (Figure 18, Item 2) on receiver dryer (Figure 18, Item 4).
N OT E
Route and install A/C hoses as noted during removal.
10. Position A/C hose (Figure 18, Item 6) on machine (Figure 18, Item 1).
11. Install receiver dryer (Figure 18, Item 4), two clamps (Figure 18, Items 3 and 2), washer (Figure 18, Item 13),
and nut (Figure 18, Item 12) on machine (Figure 18, Item 1).
12. Install two new O-rings (Figure 18, Item 8) on two A/C hoses (Figure 18, Items 7 and 11).
13. Connect two A/C hoses (Figure 18, Items 7 and 11) to receiver dryer (Figure 18, Item 4) and tighten two fittings
(Figure 18, Item 5).
Figure 18. A/C Hoses, O-rings, Receiver Dryer, and Retaining Hardware on Condenser Assembly.
0202
0202-18


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.