TM 5-2410-240-23-3
FIELD MAINTENANCE
-
CAB TRIM REPLACEMENT
021
2
Rear Mat Removal, Front Mat Removal, Left Side Console Removal, Right Side Console Removal,
Left B-Pillar Removal, Right B-Pillar Removal, Left C-Pillar Removal, Right C-Pillar Removal, Left Side
Console Disassembly, Right Side Console Disassembly, Cleaning and Inspection, Right Side Console
Assembly, Left Side Console Assembly, Right C-Pillar Installation, Left C-Pillar Installation,
Right B-Pillar Installation, Left B-Pillar Installation, Right Side Console Installation, Left Side Console
Installation, Front Mat Installation, Rear Mat Installation
INITIAL SETUP
Equipment Conditions
Tools and Special Tools
0
0
Tool Kit, General Mechanic's
Machine parked (TM 5-2410-240-10)
0
0
0
Screwdriver Attachment, Torx, 3/8" Drive, T-30
(rear mat only)
0
0
Screwdriver Attachment, Torx, 1/4" Drive, T-27
(right B-pillar only)
0
0
Materials/Parts
Drawings Required
0
0
TM 5-2410-240-24P, Figure 96, 109
0
0
Lockwasher
0
Estimated Time to Complete
0
References
1.5 Hr
0
0
0
0212-1