TM 5-2410-240-23-3
0218
CLEANING AND INSPECTION
000218
Clean and inspect all parts IAW Mechanical General Maintenance Instructions (WP 0282).
END OF TASK
INSTALLATION
000218
N OT E
Install electrical connector as tagged during removal.
1. Connect ripper control harness connector (Figure 2, Item 4) on main harness connector (Figure 2, Item 3).
2. Install ripper operation control lever (Figure 2, Item 1) on ripper control panel (Figure 2, Item 2).
3. Install control panel (Figure 1, Item 4) and eight screws (Figure 1, Items 2 and 1) on console
(Figure 1, Item 3).
END OF TASK
FOLLOW-ON TASKS
000218
Verify correct operation of machine (TM 5-2410-240-10).
END OF TASK
END OF WORK PACKAGE
0218-3/(4 blank)