• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 7. Rear Hose Routing through Battery Compartment.
Figure 9. Rear Hose Routing on Rear Pillar.

Field Maintenance Manual 3 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  450    451    452    453    454  455  456    457    458    459    460  
img
. .
TM 5-2410-240-23-3
0225
INSTALLATION CONTINUED
N OT E
Install hoses as noted during removal.
Install tiedown straps as noted during removal.
5. Install lower hose (Figure 8, Item 1) and new tiedown strap (Figure 8, Item 2) on right console area (Figure 8,
Item 3).
6. Install right side console (WP 0212).
Figure 8. Rear Hose Routing through Right Console.
0225
0225-8


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.