• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
OPERATOR PLATFORM REPLACEMENT - Continued
Figure 7. Hydraulic Service Port Bracket.

Field Maintenance Manual 3 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  557    558    559    560    561  562  563    564    565    566    567  
img
.
TM 5-2410-240-23-3
0231
INSTALLATION CONTINUED
4. Install bracket (Figure 6, Item 13), two spacers (Figure 6, Item 12), and bolts (Figure 6, Item 11) on operator
platform (Figure 6, Item 4).
5. Install clamp (Figure 6, Item 8), washer (Figure 6, Item 10), and bolt (Figure 6, Item 9) on operator platform
(Figure 6, Item 4).
6. Install clamp (Figure 6, Item 7), washer (Figure 6, Item 6), and bolt (Figure 6, Item 5) on operator platform
(Figure 6, Item 4).
7. Install two clamps (Figure 6, Item 3), washer (Figure 6, Item 2), and bolt (Figure 6, Item 1) on operator platform
(Figure 6, Item 4).
Figure 6. Support Bracket.
0231
0231-8


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.