• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
ARCTIC KIT BATTERY BOX REPLACEMENT - Continued
ARCTIC KIT BATTERY CABLE REPLACEMENT

Field Maintenance Manual 3 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  1060    1061    1062    1063    1064  1065  1066    1067    1068    1069    1070  
img
. .
TM 5-2410-240-23-3
0275
INSTALLATION CONTINUED
7. Install two nuts (Figure 5, Item 4) and washers (Figure 5, Item 5) on bottom of rods (Figure 5, Item 3).
8. Install two rods (Figure 5, Item 3) on battery box (Figure 5, Item 6).
9. Install two batteries (Figure 5, Item 8) on battery box (Figure 5, Item 6).
10. Install battery hold-down (Figure 5, Item 7), two washers (Figure 5, Item 1), and new locknuts (Figure 5, Item 2)
on rods (Figure 5, Item 3).
Figure 5. Battery Box.
0275
11. Install battery cables (WP 0276).
12. Start engine (TM 5-2410-240-10).
13. Verify correct operation of machine (TM 5-2410-240-10).
END OF TASK
END OF WORK PACKAGE
0275-8


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.