• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 3. Ether Starting Aid Cylinder.
Figure 2. Disconnecting Lamp Connectors.

Operators Manual D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  168    169    170    171    172  173  174    175    176    177    178  
img
. . . . .
6
TM 5-2410-241-10
0016
OPERATOR MAINTENANCE
-
FLOOD LAMP BULB REPLACEMENT
0
016
Removal, Installation
INITIAL SETUP
Equipment Condition
Tools
0
0
WRENCH, ADJUSTABLE, 12-INCH LONG
Machine parked (WP 0004)
0
(WP 0021, Item 6)
0
Estimated Time to Complete
0
Materials/Parts
0.2 Hr
0
0
Rag, wiping (WP 0022, Item 18)
0
Bulb
0
REMOVAL
00016
1. Remove bolt (Figure 1, Item 1) and open grille (Figure 1, Item 2).
2. Disengage and remove outer band clamp (Figure 1, Item 4) and pull lamp (Figure 1, Item 3) from grommet
(Figure 1, Item 5).
Figure 1. Flood Lamp Removal.
0016
0016-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.