• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 4. Connecting Lamp Connectors.
FUEL SYSTEM - PRIME

Operators Manual D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  172    173    174    175    176  177  178    179    180    181    182  
img
.
TM 5-2410-241-10
0016
INSTALLATION CONTINUED
5. Install lamp assembly (Figure 5, Item 3) into grommet (Figure 5, Item 5).
6. Position and engage band clamp (Figure 5, Item 4) around grommet.
7. Close grille (Figure 5, Item 2) and install bolt (Figure 5, Item 1).
Figure 5. Flood Lamp Installation.
0016
END OF TASK
END OF WORK PACKAGE
0016-5/(6 blank)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.