FUEL SYSTEM - PRIME
Figure 2. Fuse Chart.

Operators Manual D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  174    175    176    177    178  179  180    181    182    183    184  
img
. . .
6
TM 5-2410-241-10
0018
OPERATOR MAINTENANCE
-
FUSE AND CIRCUIT BREAKER MAINTENANCE
0018
Removal, Installation
INITIAL SETUP
Equipment Condition
Materials/Parts
0
0
Fuse (as required)
Machine parked (WP 0004)
0
0
0
Estimated Time to Complete
0
0.2 Hr
0
REMOVAL
00018
1. Open battery compartment cover (Figure 1, Item 2).
2. Open fuse panel access door (Figure 1, Item 1) and remove fuse cover (Figure 1, Item 3).
Figure 1. Fuse Panel Access.
0018
0018-1