Table 1. Powertrain Troubleshooting Procedures - Continued.
Table 1. Powertrain Troubleshooting Procedures - Continued.

Field Maintenance Manual 1 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  565    566    567    568    569  570  571    572    573    574    575  
img
. . . . . . . . . . . .
TM 5-2410-241-23-1
0020
Table 1. Powertrain Troubleshooting Procedures - Continued.
0020
MALFUNCTION
TEST OR INSPECTION
CORRECTIVE ACTION
689-6 Left Brake Solenoid
5. Remove left platform access panel
Current Above Normal -
(WP 0207).
Continued
6. Disconnect powertrain ECM con-
nector X-C3 (WP 0018, Figure 3)
from the powertrain ECM.
7. Disconnect powertrain ECM con-
nector X-C2 (WP 0018, Figure 4)
from the powertrain ECM.
8. Disconnect platform harness con-
nector MA-C14 (WP 0018, Figure
33) from steering control harness
connector X-C1 (WP 0018,
Figure 34).
9. Using a digital multimeter (WP
1.
If continuity is found, proceed to
0296), test for continuity between
step 10.
pin 58 on powertrain ECM connec- 2.
If continuity is NOT found, replace
tor X-C2 (WP 0018, Figure 4) and
steering control harness (WP
pin 37 on steering control harness
0178). Ensure all harness connec-
connector X-C1 (WP 0018,
tors are reconnected. Verify cor-
Figure 34).
rect operation of machine (TM 5-
2410-241-10).
10. Using a digital multimeter (WP
1.
If continuity is found, proceed to
0296), test for continuity between
step 11.
pin 60 on powertrain ECM connec- 2.
If continuity is NOT found, replace
tor X-C2 (WP 0018, Figure 4) and
steering control harness (WP
pin 41 on steering control harness
0178). Ensure all harness connec-
connector X-C1 (WP 0018,
tors are reconnected. Verify cor-
Figure 34).
rect operation of machine (TM 5-
2410-241-10).
11. Using a digital multimeter (WP
1.
If continuity is NOT found, proceed
0296), test for continuity between
to step 12.
pin 58 on powertrain ECM connec- 2.
If continuity is found, replace
tor X-C2 (WP 0018, Figure 4) and
steering control harness (WP
all other pins in powertrain ECM
0178). Ensure all harness connec-
connector X-C2 (WP 0018,
tors are reconnected. Verify cor-
Figure 4).
rect operation of machine (TM 5-
2410-241-10).
12. Using a digital multimeter (WP
1.
If continuity is NOT found, proceed
0296), test for continuity between
to step 13.
pin 60 on powertrain ECM connec- 2.
If continuity is found, replace
tor X-C2 (WP 0018, Figure 4) and
steering control harness (WP
all other pins in powertrain ECM
0178). Ensure all harness connec-
connector X-C2 (WP 0018,
tors are reconnected. Verify cor-
Figure 4).
rect operation of machine (TM 5-
2410-241-10).