• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 6. Upper Cooling Pipe.
Figure 9. Mounting Plate.

Field Maintenance Manual 1 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  1108    1109    1110    1111    1112  1113  1114    1115    1116    1117    1118  
img
.
TM 5-2410-241-23-1
0049
INSTALLATION CONTINUED
N OT E
Install hoses as tagged during removal.
5. Install two hoses (Figure 7, Item 1) and four clamps (Figure 7, Item 2) on water pipe (Figure 7, Item 3).
6. Position bracket (Figure 7, Item 5) on machine.
7. Install two hoses (Figure 7, Item 1) and water pipe (Figure 7, Item 3) on engine (Figure 7, Item 4).
8. Tighten four clamps (Figure 7, Item 2) on two hoses (Figure 7, Item 1).
Figure 7. Lower Cooling Pipe.
0049
9. Install bracket (Figure 8, Item 4), four washers (Figure 8, Item 3) and bolts (Figure 8, Item 2) on engine.
10. Install two clips (Figure 8, Item 1), washers (Figure 8, Item 5) and bolts (Figure 8, Item 6) on bracket (Figure 8,
Item 4).
Figure 8. Cooling Pipe Mount.
0049
0049-7


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.