• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 10. Vent Lines.
Figure 12. Water Pump Input Line.

Field Maintenance Manual 1 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  1138    1139    1140    1141    1142  1143  1144    1145    1146    1147    1148  
img
.
TM 5-2410-241-23-1
0051
VENT LINE INSTALLATION
00051
N OT E
Install hoses as tagged during removal.
1. Install clamp (Figure 11, Item 2) and hose (Figure 11, Item 1) on valve (Figure 11, Item 3).
2. Install bolt (Figure 11, Item 12), washer (Figure 11, Item 13), clip (Figure 11, Item 11) and hose (Figure 11,
Item 1) on bracket (Figure 11, Item 14).
3. Install clamp (Figure 11, Item 8) and hose (Figure 11, Item 1) on fitting (Figure 11, Item 9).
4. Install clamp (Figure 11, Item 10) and hose (Figure 11, Item 4) on fitting (Figure 11, Item 9).
5. Install clamp (Figure 11, Item 5) and hose (Figure 11, Item 4) on fitting (Figure 11, Item 6) on water temperature
regulator (Figure 11, Item 7).
Figure 11. Vent Lines.
0051
END OF TASK
0051-12


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.