• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 16. Ether Aid Solenoid Connection.
Figure 18. Underhood Work Light Connection.

Field Maintenance Manual 1 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  1183    1184    1185    1186    1187  1188  1189    1190    1191    1192    1193  
img
.
TM 5-2410-241-23-1
0055
INSTALLATION CONTINUED
N OT E
Install harness as noted during removal.
Connect connectors as tagged and marked during removal.
Install tiedown straps as noted during removal.
15. Connect engine main harness connector (Figure 17, Item 6) and tighten bolt (Figure 17, Item 4) on platform
connector (Figure 17, Item 1).
16. Install platform connector (Figure 17, Item 1) and engine main harness connector (Figure 17, Item 6) on
bracket (Figure 17, Item 2).
17. Connect engine main harness connector (Figure 17, Item 8) on platform connector (Figure 17, Item 7).
18. Install new tiedown straps (Figure 17, Item 9) on platform connectors (Figure 17, Items 1 and 7).
19. Connect engine main harness connector (Figure 17, Item 5) on ether aid relay (Figure 17, Item 3).
Figure 17. Platform Harness Connections.
0055
0055-17


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.