• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 20. Starter Solenoid Connection.
ENGINE MAIN WIRING HARNESS ASSEMBLY REPLACEMENT - Continued

Field Maintenance Manual 1 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  1187    1188    1189    1190    1191  1192  1193    1194    1195  
img
.
TM 5-2410-241-23-1
0055
INSTALLATION CONTINUED
N OT E
Install harness as noted during removal.
Connect connectors as tagged and marked during removal.
28. Install two connectors (Figure 21, Item 2), ground cables (Figure 21, Item 3), ground strap (Figure 21, Item 4),
and nut (Figure 21, Item 5) on starter (Figure 21, Item 1).
Figure 21. Starter Ground Connections.
0055
N OT E
Install harness as noted during removal.
Connect connectors as tagged and marked during removal.
Install tiedown straps as noted during removal.
29. Connect engine main harness connector (Figure 22, Item 2) to front lighting harness connector (Figure 22,
Item 1).
30. Install tiedown straps (Figure 22, Item 3) on engine main harness (Figure 22, Item 2).
Figure 22. Radiator Harness Connector.
0055
END OF TASK
0055-21


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.