• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
ENGINE MAIN WIRING HARNESS ASSEMBLY REPLACEMENT - Continued
Figure 2. Fuel Temperature Sensor Harness.

Field Maintenance Manual 1 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  1189    1190    1191    1192    1193  1194  1195  
img
. .
2
TM 5-2410-241-23-1
0056
FIELD MAINTENANCE
-
CRANK WITHOUT INJECTION WIRING HARNESS ASSEMBLY REPLACEMENT
0056
Removal, Cleaning and Inspection, Installation
INITIAL SETUP
Equipment Condition
Tools and Special Tools
0
0
Tool Kit, General Mechanic's
Machine parked (TM 5-2410-241-10)
0
(WP 0302, Item 65)
0
Drawing Required
0
Materials/Parts
TM 5-2410-241-24P, Figure 11
0
0
Rag, Wiping (WP 0303, Item 24)
0
Estimated Time to Complete
0
Tag, Marker (WP 0303, Item 34)
0
0.5 Hr
Tiedown Strap (WP 0303, Item 36)
0
0
References
0
WP 0295
0
REMOVAL
00056
N OT E
Note harness routing to aid installation.
Tag and mark all electrical connections to aid installation.
1. Disconnect plug (Figure 1, Item 6) from connector (Figure 1, Item 5).
2. Remove tiedown strap (Figure 1, Item 1) from wiring harness (Figure 1, Item 2). Discard tiedown strap.
3. Remove two tiedown straps (Figure 1, Item 3) from wiring harness (Figure 1, Item 2) and connector (Figure 1,
Item 4). Discard tiedown straps.
4. Disconnect connector (Figure 1, Item 4) from wiring harness (Figure 1, Item 2).
5. Remove harness (Figure 1, Item 2) from machine.
Figure 1. Fuel Temperature Sensor Harness.
0056
END OF TASK
0056-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.