• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 11. A/C Hose.
Figure 13. Hose Bundle Clamps.

Field Maintenance Manual D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  9    10    11    12    13  14  15    16    17    18    19  
img
.
TM 5-2410-241-23-2
0057
ENGINE REMOVAL CONTINUED
N OT E
Tag and mark all hoses to aid installation.
Note location and quantity of tiedown straps to aid installation.
37. Remove tiedown straps (Figure 12, Item 2) from engine main harness connectors (Figure 12, Items 3 and 9).
Discard tiedown straps.
38. Disconnect engine main harness connector (Figure 12, Item 7) from ether aid relay (Figure 12, Item 4).
39. Disconnect engine main harness connector (Figure 12, Item 9) from platform connector (Figure 12, Item 10).
40. Loosen bolt (Figure 12, Item 8) and disconnect engine main harness connector (Figure 12, Item 3) from
platform connector (Figure 12, Item 1).
N OT E
Cap and plug all hoses, lines and tubesto prevent contamination and leaks.
Tag and mark all hoses to aid installation.
41. Loosen two clamps (Figure 12, Item 5) from two heater hoses (Figure 12, Item 6).
42. Remove two heater hoses (Figure 12, Item 6) from cab.
Figure 12. Platform Harness Connections.
0057
0057-14


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.