• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 9. Starter Motor Ground Connections.
ENGINE REMOVAL CONTINUED

Field Maintenance Manual D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  6    7    8    9    10  11  12    13    14    15    16  
img
.
TM 5-2410-241-23-2
0057
ENGINE REMOVAL CONTINUED
N OT E
Tag and mark all hoses to aid installation.
29. Position boot (Figure 10, Item 6) aside and remove nut (Figure 10, Item 7) and positive battery cable (Figure
10, Item 1) from starter motor solenoid (Figure 10, Item 8).
30. Loosely install nut (Figure 10, Item 7) on starter motor solenoid (Figure 10, Item 8).
31. Remove tiedown straps (Figure 10, Item 2) from positive battery cable (Figure 10, Item 1). Discard tiedown
straps. Place positive cable aside.
32. Remove tiedown straps (Figure 10, Item 4) and harness (Figure 10, Item 5) from frame (Figure 10, Item 3).
Place harness aside. Discard tiedown straps.
Figure 10. Starter Motor.
0057
0057-11


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.