Figure 4. Starter.
STARTER REPLACEMENT - Continued

Field Maintenance Manual D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  151    152    153    154    155  156  157    158    159    160    161  
img
.
TM 5-2410-241-23-2
0061
INSTALLATION CONTINUED
N OT E
Install cables as noted during removal.
4. Install cable (Figure 5, Item 7) and nut (Figure 5, Item 8) on machine.
5. Install cable (Figure 5, Item 4), cable (Figure 5, Item 3), cable (Figure 5, Item 7), ground strap (Figure 5,
Item 5), cable (Figure 5, Item 2), and nut (Figure 5, Item 6) on starter (Figure 5, Item 1).
Figure 5. Ground Cables.
0061
N OT E
Install cables as noted during removal.
6. Install cable (Figure 6, Item 3) and nut (Figure 6, Item 2) on starter (Figure 6, Item 7).
7. Install cable (Figure 6, Item 6), cable (Figure 6, Item 4), and nut (Figure 6, Item 1) on starter (Figure 6, Item 7).
8. Position boot (Figure 6, Item 5) over nut (Figure 6, Item 1).
Figure 6. Power Cables.
0061
END OF TASK