• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 17. Ether Bottle Gasket.
STARTER REPLACEMENT

Field Maintenance Manual D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  146    147    148    149    150  151  152    153    154    155    156  
img
.
TM 5-2410-241-23-2
0060
ETHER BOTTLE INSTALLATION CONTINUED
2. Install bottle (Figure 18, Item 1) on clamp (Figure 18, Item 2) and ether valve (Figure 18, Item 3).
3. Tighten clamp (Figure 18, Item 2) on bottle (Figure 18, Item 1).
Figure 18. Ether Bottle.
0060
END OF TASK
FOLLOW-ON TASKS
00060
Verify correct operation of machine (TM 5-2410-241-10).
END OF TASK
END OF WORK PACKAGE
0060-19/(20 blank)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.