• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 13. Ether Bottle and Line.
Figure 15. Ether Bottle and Line.

Field Maintenance Manual D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  142    143    144    145    146  147  148    149    150    151    152  
img
.
TM 5-2410-241-23-2
0060
ETHER VALVE INSTALLATION
00060
1. Install fitting (Figure 14, Item 16) on valve (Figure 14, Item 14).
2. Install valve (Figure 14, Item 14), bracket (Figure 14, Item 15), cap (Figure 14, Item 5), tether (Figure 14,
Item 4), and two bolts (Figure 14, Item 3) on bracket (Figure 14, Item 7).
3. Install housing (Figure 14, Item 1) and screw (Figure 14, Item 2) on bracket (Figure 14, Item 15).
4. Install cap (Figure 14, Item 5) on housing (Figure 14, Item 1).
5. Install new gasket (Figure 14, Item 6) on valve (Figure 14, Item 14).
6. Install bracket (Figure 14, Item 7), clip (Figure 14, Item 10), two washers (Figure 14, Item 9), and nuts (Figure
14, Item 8) on machine.
7. Connect connector (Figure 14, Item 12) to connector (Figure 14, Item 13).
8. Install new tiedown strap (Figure 14, Item 11) on connector (Figure 14, Item 13).
Figure 14. Ether Valve.
0060
0060-15


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.