ETHER VALVE INSTALLATION CONTINUED
9. Install line (Figure 15, Item 6) and tube nut (Figure 15, Item 5) on fitting (Figure 15, Item 4).
10. Install bottle (Figure 15, Item 1) on clamp (Figure 15, Item 2) and ether valve (Figure 15, Item 3).
11. Tighten clamp (Figure 15, Item 2) on bottle (Figure 15, Item 1).
Figure 15. Ether Bottle and Line.
0060
END OF TASK