• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 11. Ether Valve Mounting Bracket.
Figure 13. Ether Bottle and Line.

Field Maintenance Manual D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  140    141    142    143    144  145  146    147    148    149    150  
img
.
TM 5-2410-241-23-2
0060
ETHER VALVE AND BOTTLE SUPPORT BRACKET INSTALLATION CONTINUED
3. Install fitting (Figure 12, Item 16) on valve (Figure 12, Item 14).
4. Install valve (Figure 12, Item 14), bracket (Figure 12, Item 15), cap (Figure 12, Item 5), tether (Figure 12,
Item 4), and two bolts (Figure 12, Item 3) on bracket (Figure 12, Item 7).
5. Install housing (Figure 12, Item 1) and screw (Figure 12, Item 2) on bracket (Figure 12, Item 15).
6. Install cap (Figure 12, Item 5) on housing (Figure 12, Item 1).
7. Install new gasket (Figure 12, Item 6) on valve (Figure 12, Item 14).
8. Install bracket (Figure 12, Item 7), clip (Figure 12, Item 10), two washers (Figure 12, Item 9), and nuts (Figure
12, Item 8) on machine.
9. Connect connector (Figure 12, Item 12) to connector (Figure 12, Item 13).
10. Install new tiedown strap (Figure 12, Item 11) on connector (Figure 12, Item 13).
Figure 12. Ether Valve.
0060
0060-13


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.