Home
Download PDF
Order CD-ROM
Order in Print
Figure 1. Front Housing Cover.
OIL FILTER ENGINE BASE ASSEMBLY REPLACEMENT
Field Maintenance Manual D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
274
275
276
277
278
279
280
281
282
283
284
TM
5-2410-241-23-2
0081
FOLLOW-ON TASKS
00081
1.
Install
fuel
transfer
pump
(
WP
0073
).
2.
Install
front
crankshaft
seal
(WP
0079).
3.
Install
alternator
and
bracket
(WP
0099).
4. Verify correct
operation
of
machine
(TM
5-2410-241-10).
END
OF
TASK
END
OF
WORK
PACKAGE
0081-3/(4
blank)