• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 8. Oil Pump and Elbow - On Engine.
OIL PAN REPLACEMENT

Field Maintenance Manual D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  334    335    336    337    338  339  340    341    342    343    344  
img
. .
TM 5-2410-241-23-2
0088
INSTALLATION CONTINUED
9. Install two washers (Figure 9, Item 3) and bolts (Figure 9, Item 2) on oil pump (Figure 9, Item 1). Tighten all
bolts.
Figure 9. Oil Pump Mounting Bolts.
0088
END OF TASK
FOLLOW-ON TASKS
00088
1. Install engine enclosure right door guard (WP 0204).
2. Install engine bottom guard (WP 0199).
3. Check engine oil level (WP 0114).
4. Verify correct operation of machine (TM 5-2410-241-10).
END OF TASK
END OF WORK PACKAGE
0088-8


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.