• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 2. Harness.
INSTALLATION

Field Maintenance Manual D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  338    339    340    341    342  343  344    345    346    347    348  
img
.
TM 5-2410-241-23-2
0089
REMOVAL CONTINUED
5. Remove 13 bolts (Figure 3, Item 1), washers (Figure 3, Item 17), isolators (Figure 3 Item 18) and oil pan
(Figure 3, Item 2) from engine.
6. Remove gasket (Figure 3, Item 16) and 14 sleeves (Figure 3, Item 19) from oil pan (Figure 3, Item 2). Discard
gasket.
7. Remove four bolts (Figure 3, Items 11 and 15), washers (Figure 3, Items 10 and 14), two spacers (Figure 3,
Item 13) and oil pickup (Figure 3, Item 12) from engine.
8. Remove O-ring (Figure 3, Item 9) from oil pickup tube (Figure 3, Item 12). Discard O-ring.
9. Remove two plugs (Figure 3, Item 7) and washers (Figure 3, Item 8) from oil pan (Figure 3, Item 2).
10. Remove two pipe plugs (Figure 3, Item 3) from oil pan (Figure 3, Item 2).
11. Remove two bolts (Figure 3, Item 6), one adapter (Figure 3, Item 5), and gasket (Figure 3, Item 4) from oil pan
(Figure 3, Item 2). Discard gasket.
Figure 3. Oil Pan.
0089
END OF TASK
CLEANING AND INSPECTION
00089
Clean and inspect all components IAW Mechanical General Maintenance Instructions (WP 0295).
END OF TASK
0089-4


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.