Figure 3. Alternator V-Belts.
ALTERNATOR AND BRACKETS REPLACEMENT

Field Maintenance Manual D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  392    393    394    395    396  397  398    399    400    401    402  
img
.
TM 5-2410-241-23-2
0098
INSTALLATION
00098
N OT E
If new belts are installed, check beltadjustment after 30 minutes of operation.
If equipped with arctic heater, install arctic belts.
1. Install two belts (Figure 3, Item 3) on machine.
2. While holding belts (Figure 3, Item 3) in position, move alternator (Figure 3, Item 8) outward and tighten nut
(Figure 3, Item 4) until correct belt tension is achieved.
3. Once correct belt tension is achieved, tighten nut (Figure 3, Item 6).
4. Tighten bolt (Figure 3, Item 7) and nut (Figure 3, Item 5) on alternator (Figure 3, Item 8).
5. Tighten bolt (Figure 3, Item 1) on shaft (Figure 3, Item 2).
6. Tighten two bolts (Figure 4, Item 2) on alternator (Figure 4, Item 1).
Figure 4. Alternator Mounting Bolts.
0098
END OF TASK
FOLLOW-ON TASKS
00098
1. Install A/C condenser (WP 0044).
2. Install engine enclosure right door guard (WP 0204).
3. Verify correct operation of machine (TM 5-2410-241-10).
END OF TASK
END OF WORK PACKAGE
0098-5/(6 blank)