• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 7. ECM Connector.
Figure 9. ECM Connector.

Field Maintenance Manual D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  439    440    441    442    443  444  445    446    447    448    449  
img
.
TM 5-2410-241-23-2
0105
REMOVAL CONTINUED
Figure 8. ECM Harness.
00105
END OF TASK
CLEANING AND INSPECTION
000105
Clean and inspect all parts IAW Mechanical General Maintenance Instructions (WP 0295).
END OF TASK
INSTALLATION
000105
N OT E
Install electrical connections, harness routing and tiedown straps as noted during removal.
1. Install harness (Figure 8, Item 4) and new tiedown straps (Figure 8, Item 3) on engine (Figure 8, Item 2).
2. Install clamp (Figure 8, Item 5), washer (Figure 8, Item 7) and bolt (Figure 8, Item 6) on harness (Figure 8, Item
4).
3. Connect connector (Figure 8, Item 1) on engine (Figure 8, Item 2).
0105-9


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.