• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 9. Bracket.
AIR CLEANER ASSEMBLY SERVICE

Field Maintenance Manual D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  501    502    503    504    505  506  507    508    509    510    511  
img
. .
TM 5-2410-241-23-2
0110
INSTALLATION CONTINUED
N OT E
Install hoses as tagged during removal.
9. Connect hose (Figure 10, Item 8) on lower radiator tank (Figure 10, Item 9) and tighten clamp (Figure 10,
Item 7).
10. Connect hose (Figure 10, Item 6) on lower radiator tank (Figure 10, Item 9) and tighten clamp (Figure 10,
Item 5).
11. Connect hose (Figure 10, Item 4) on lower radiator tank (Figure 10, Item 9) and tighten clamp (Figure 10,
Item 3).
12. Connect hose (Figure 10, Item 1) on lower radiator tank (Figure 10, Item 9) and tighten clamp (Figure 10,
Item 2).
Figure 10. Hoses.
0110
END OF TASK
FOLLOW-ON TASKS
000110
1. Install radiator cores (WP 0109).
2. Install bottom guard (WP 0199).
3. Verify correct operation of machine (TM 5-2410-241-10).
END OF TASK
END OF WORK PACKAGE
0110-10


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.