• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 4. Cylinder Head Bolts Torque Sequence.
CENTER RADIATOR CORE REMOVAL

Field Maintenance Manual D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  477    478    479    480    481  482  483    484    485    486    487  
img
. .
16
TM 5-2410-241-23-2
0109
FIELD MAINTENANCE
-
RADIATOR CORE SERVICE
0109
Center Radiator Core Removal, Outer Position Radiator Core Removal, Cleaning and Inspection,
Outer Position Radiator Core Installation, Center Radiator Core Installation
INITIAL SETUP
Tools and Special Tools
Personnel Required
0
0
Tool Kit, General Mechanic's
Two
0
(WP 0302, Item 65)
0
References
0
Sling, Multiple Leg (WP 0302, Item 54)
0
WP 0295
0
Lifting Device (500 lb capacity)
0
Equipment Condition
0
Materials/Parts
0
Machine parked (TM 5-2410-241-10)
0
Rag, Wiping (WP 0303, Item 24)
0
Coolant drained (WP 0113)
0
Tag, Marker (WP 0303, Item 34)
0
Emery Cloth
0
Drawing Required
0
Gasket (2)
0
TM 5-2410-241-24P, Figure 2
0
Estimated Time to Complete
0
1.5 Hr
0
0109-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.