6
TM 5-2410-241-23-2
FIELD MAINTENANCE
-
COOLING SYSTEM SERVICE
0113
Drain and Flushing Procedure, Coolant Level Check
INITIAL SETUP
Tools and Special Tools
References
0
0
Tool Kit, General Mechanic's
WP 0039
0
(WP 0302, Item 65)
0
WP 0199
0
Gloves, Rubber (S0208)
Equipment Condition
0
(WP 0302, Item 68)
0
Machine parked (TM 5-2410-241-10)
0
Goggles (S0209)
(WP 0302, Item 68)
0
Estimated Time to Complete
0
Pan, Drain (S0255)
2.5 Hr
0
0
(WP 0302, Item 68)
Materials/Parts
0
Antifreeze, Permanent,
Ethylene Glycol, Inhibited
0
(WP 0303, Item 1)
Rag, Wiping (WP 0303, Item 24)
0
0113-1