• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
IMPLEMENT PUMP REPLACEMENT
Figure 1. Implement Pump.

Field Maintenance Manual D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  516    517    518    519    520  521  522    523    524    525    526  
img
TM 5-2410-241-23-2
0112
REMOVAL
000112
1. Loosen tube nut (Figure 1, Item 10) and remove line (Figure 1, Item 3) from fitting (Figure 1, Item 12).
2. Remove bolt (Figure 1, Item 8), washer (Figure 1, Item 6), clamp (Figure 1, Item 9) and line (Figure 1, Item 3)
from bracket (Figure 1, Item 7).
N OT E
Note orientation and position of fitting to aid installation.
3. Loosen nut (Figure 1, Item 13) and remove fitting (Figure 1, Item 12) from implement pump (Figure 1, Item 2).
4. Remove two O-rings (Figure 1, Items 11 and 14) from fitting (Figure 1, Item 12). Discard O-rings.
WARN I N G
Use extreme caution when handling heavy parts. Provide adequate support and use
assistance during procedure. Ensure lifting device used is in good condition and of
suitable load capacity. Keep clear of heavy parts supported only by lifting device. Failure
to follow this warning may cause injury or death to personnel.
0112-2


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.