• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
IMPLEMENT PUMP REPLACEMENT - Continued
COOLING SYSTEM SERVICE

Field Maintenance Manual D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  519    520    521    522    523  524  525    526    527    528    529  
img
. .
TM 5-2410-241-23-2
0112
INSTALLATION CONTINUED
N OT E
Install fitting as noted during removal.
7. Install fitting (Figure 2, Item 12) and nut (Figure 2, Item 13) on implement pump (Figure 2, Item 2).
8. Install line (Figure 2, Item 3), clamp (Figure 2, Item 9), washer (Figure 2, Item 6), and bolt (Figure 2, Item 8) on
bracket (Figure 2, Item 7).
9. Install line (Figure 2, Item 3) and tube nut (Figure 2, Item 10) on fitting (Figure 2, Item 12).
Figure 2. Implement Pump.
0112
END OF TASK
FOLLOW ON TASKS
000112
1. Install engine (WP 0057).
2. Verify correct operation of machine (TM 5-2410-241-10).
END OF TASK
END OF WORK PACKAGE
0112-5/(6 blank)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.