• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 9. Air Cleaner Housing and Elements.
Figure 12. Air Cleaner Boot.

Field Maintenance Manual D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  511    512    513    514    515  516  517    518    519    520    521  
img
.
TM 5-2410-241-23-2
0111
AIR CLEANER ASSEMBLY INSTALLATION CONTINUED
N OT E
Install bolts as noted during removal.
4. Install air cleaner housing (Figure 10, Item 1), four washers (Figure 10, Item 3), and bolts (Figure 10, Item 2) on
bracket (Figure 10, Item 4).
Figure 10. Air Cleaner Housing.
0111
5. Install precleaner body (Figure 11, Item 3), four washers (Figure 11, Item 7) and bolts (Figure 11, Item 8) on
hood (Figure 11, Item 1).
6. Install prescreener (Figure 11, Item 2), clamp (Figure 11, Item 4), bolt (Figure 11, Item 5) and nut (Figure 11,
Item 6) on precleaner body (Figure 11, Item 3).
Figure 11. Air Cleaner Prescreener.
0111
0111-10


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.