• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
TRANSMISSION MOUNTING REPLACEMENT
TRANSMISSION MOUNTING REPLACEMENT - Continued

Field Maintenance Manual D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  568    569    570    571    572  573  574    575    576    577    578  
img
.
TM 5-2410-241-23-2
0121
REMOVAL
000121
1. Remove four locknuts (Figure 1, Item 1), washers (Figure 1, Item 2), bolts (Figure 1, Item 7), and washers
(Figure 1, Item 8) from two tube assemblies (Figure 1, Item 3). Discard locknuts.
2. Remove two tube assemblies (Figure 1, Item 3) from machine.
3. Remove spring pin (Figure 1, Item 4), two washers (Figure 1, Item 5), and springs (Figure 1, Item 6) from tube
assembly (Figure 1, Item 3).
4. Repeat step 3 for other tube assembly.
Figure 1. Transmission Mounting Tubes.
0121
END OF TASK
CLEANING AND INSPECTION
000121
Clean and inspect all parts IAW Mechanical General Maintenance Instructions (WP 0295).
END OF TASK
0121-2


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.