• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
TRUNNION REPLACEMENT - Continued
Figure 2. Front Strip Plate.

Field Maintenance Manual D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  622    623    624    625    626  627  628    629    630    631    632  
img
. .
4
TM 5-2410-241-23-2
0131
FIELD MAINTENANCE INSTRUCTIONS
-
STRIP PLATE REPLACEMENT
0
131
Removal, Cleaning and Inspection, Installation
INITIAL SETUP
Equipment Condition
Tools and Special Tools
0
0
Machine parked (TM 5-2410-241-10)
0
Tool Kit, General Mechanic's
(WP 0302, Item 65)
0
Drawing Required
0
Materials/Parts
0
TM 5-2410-241-24P, Figure 63
0
Rag, Wiping (WP 0303, Item 24)
0
Estimated Time to Complete
0
References
0
1.0 Hr
0
WP 0295
0
REMOVAL
000131
N OT E
Procedure will remove four strip plates from right track roller frame. Follow the same
procedure to remove four strip plates from left track roller frame.
1. Remove six bolts (Figure 1, Item 3), washers (Figure 1, Item 4), and two strip plates (Figure 1, Item 1) from
track roller frame (Figure 1, Item 2).
Figure 1. Rear Strip Plate.
0131
0131-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.